Define the same starting scope for every conversation. Mark unknowns; do not invent dimensions or prices.
| Room / area | Keep / protect | Change / proposed work | Open selection or question |
|---|---|---|---|
| Kitchen | |||
| Bathroom 1 | |||
| Bathroom 2 | |||
| Flooring | |||
| Walls / ceilings | |||
| Lighting / electrical | |||
| Other area |
Before comparing proposals: have each contractor identify any difference from this scope. Proposed changes still require appropriate review.
Ask which items apply to your building. This worksheet is not the association application or an approval.
| Question / document | Written answer / document reference | Responsible person / date | Status |
|---|---|---|---|
| Current renovation packet and review contact | |||
| Required drawings / scope information | |||
| Contractor / insurance documents requested | |||
| Work and delivery hours | |||
| Floor-finish / assembly requirements | |||
| Common-area protection and cleanup | |||
| Utility shutdown coordination | |||
| Permit authority / process to confirm |
Status: Open / Awaiting answer / Confirmed / Not applicable. Record the source and date before marking Confirmed or Not applicable. Building and permit requirements are separate questions.
Confirm the route and arrangements for the actual unit before ordering or booking work. No route measurement is supplied by this kit.
| Activity / route | Requirement / restriction to confirm | Person / evidence / date | Requested vs confirmed time |
|---|---|---|---|
| Truck unloading / parking | |||
| Entry and route to unit | |||
| Elevator / lift reservation, if applicable | |||
| Route dimensions and item fit | |||
| Material staging / storage | |||
| Protection before delivery | |||
| Debris route and pickup | |||
| Trade / inspection access |
Treat a proposed time as unconfirmed until the responsible party documents the booking. Keep keys, access codes and security details in a separate private record.
Give each unresolved item a responsible person and a written evidence requirement. Recheck after scope changes.
| Question / decision | Responsible person / due date | Evidence needed / source | Status / what must wait |
|---|---|---|---|
Fictional example: Proposed floor finish | Owner obtains building packet; contractor reviews proposal | Written requirements plus proposed assembly information | OPEN: confirm before purchase. This is not a floor specification.
Official starting points, checked October 8, 2026: St. Petersburg permits / Clearwater permitting / Tampa permit routing. Confirm jurisdiction and the current process for the proposed work. Tampa distinguishes condo work from the single-family residential route.